NEW HORIZONS AND OPPORTUNITIES OF MODULAR CONSTRUCTIONS AND THEIR TECHNOLOGY
Abstract views: 348 / PDF downloads: 181
DOI:
https://doi.org/10.59287/ijanser.393Keywords:
Modular Constructions, Prefabricated, Constructions, Technology, Building MaterialsAbstract
The use of modular construction technology has emerged as a promising solution to the challenges of the construction industry all over the world. This paper examines the new horizons and opportunities that modular construction technology offers not only in the Albanian context but also in some European countries. The paper provides an overview of the status of Albania's construction market and emphasizes the advantages of modular construction technology, including quicker construction, lower costs, and better quality control. Unfortunately, prefabricated constructions are not very present Albanian construction industry, and it is not given the proper attention due to lack of infrastructure, organizational purposes, and lack of proper experience. The paper also examines the challenges associated with the implementation of modular construction technology in Albania, exploring the history of prefabricated constructions, also including regulatory barriers, lack of awareness, and the need for skilled labor. Finally, the paper concludes by suggesting strategies to overcome these challenges and promote the adoption of modular construction technology in Albania, such as targeted government policies, education and training programs, and partnerships between industry stakeholders.
Downloads
References
Julius Endzelis, Mindaugas Daukšys, “Comparison Between Modular Building Technology and Traditional Construction”, Journal of Sustainable Architecture and Civil Engineering, 2018. Doi: https://doi.org/10.5755/j01.sace.23.2.21579
E. Smith, “Off-site construction implementation”, resource: Off-site and modular construction explained, National institute of building sciences, 2016; 1-6.
E. M. Generalova, V. P. Generalov, A. A. Kuznetsova, “Modular buildings in modern construction”, Procedia engineering, 2016; 153:167-172. https://doi. org/10.1016/j.proeng.2016.08.098
J. Zhang, Y. Long, S. Lv, Y. Xiang, “BIM-enabled modular and industrializes construction in China”, Procedia engineering, 2016; 145:1456-1461. https://doi. org/10.1016/j.proeng.2016.04.183
D. Lopez, T. Froese, “Analysis of costs and benefits of panelized and modular prefabricated homes”, Procedia engineering, 2016; 145:1291-1297. https:// doi.org/10.1016/j.proeng.2016.04.166.
O. Mohsen, P. Knytl, B. Abdulaal, J. Olearczyk, M. Al-Hussein, “Simulation of modular building construction”, Proceedings of the 2008-winter simulation conference, 2008; 2471-2478. https://doi. org/10.1109/WSC.2008.4736356
J. Lee, M. Park, H. Lee, T. Kim, S. Kim, H. Hyun, “Workflow dependency approach for modular building construction manufacturing process using dependency structure matrix (DSM)”, KSCE journal of civil engineering, 2017; 21:1525-1535. https://doi. org/10.1007/s12205-016-1085-1
M. Kamali, K. Hewage, “Life cycle performance of modular buildings: A critical review”, Renewable and sustainable energy reviews, 2016; 62:1171-1183. https://doi.org/10.1016/j.rser.2016.05.031
[9] B. Sevenson, “Chinese unveil mysterious 3D printed house – Built out of unique material, able to withstand devastating earthquakes”, 3Dprint.com, 2015, available at: https://3dprint.com/82322/chinese-3d-modular-homes.
M. Larsson, A. Kaiser, U. A. Girhammar, “Multi-storey modular manoeuvres – Innovative architectural stacking methodology based on three Swedish timber building systems, Auckland”, New Zealand 15-19 July 2012, World conference on timber engineering, 2012; 63-72.
A. Morby, “Green light for world’s tallest modular tower in Croydon”, Construction enquirer, 2017, available at: https://www.constructionenquirer. com/2017/12/04/green-light-for-worlds-tallestmodular-tower-in-croydon
Generalova E.M., Generalov V.P., Kuznetsova A.A, “Modular buildings in modern construction”, Procedia Engineering. 2016. V. 153. Pp. 167–172. Doi: 10.1016/j.proeng.2016.08.098.
Shirokov V.S, “Design features of modular buildings”, The Eurasian Scientific Journal, 14(3): 03SAVN322. Available at: https://esj.today/PDF/03SAVN322.pdf. (In Russ., abstract in Eng.). DOI: 10.15862/03SAVN322.
Lacey A.W., Chen W., Hao H., Bi K, “Structural Response of Modular Buildings — An Overview”, Journal of Building Engineering. 2018. V. 23. Pp. 45–56. Doi.org/10.1016/j.jobe.2017.12.008.
Deng E.-F., Zong L., Ding Y., Zhang Z., Zhang J.-F., Shi F.-W., Cai L.-M., Gao S.-C, “Seismic performance of mid-to-high rise modular steel construction- A critical review”, Thin-Walled Structures. 2020. V. 155. — P. 106924. Doi.org/10.1016/j.tws.2020.106924
Lawson R.M., Richards J, “Modular design for high-rise buildings”, Proceedings of the Institution of Civil Engineers Structures and Buildings. 2010. V. 163. Pp. 151–164. Doi.org/10.1680/stbu.2010.163.3.151.
https://www.steelconstruction.info/Modular_construction
https://www.stentprojects.co.uk/modular/#about-modular
Shirokov V.S, “Design features of modular buildings”, The Eurasian Scientific Journal, 14(3): 03SAVN322. Available at: https://esj.today/PDF/03SAVN322.pdf. (In Russ., abstract in Eng.). DOI: 10.15862/03SAVN322
Deng E.-F., Zong L., Ding Y., Zhang Z., Zhang J.-F., Shi F.-W., Cai L.-M., Gao S.-C, “Seismic performance of mid-to-high rise modular steel construction, A critical review”, Thin-Walled Structures. 2020. V. 55. P. 106924. Doi.org/10.1016/j.tws.2020.106924.
Liew J.Y.R, “Innovation in modular building construction”, Ninth International Conference on Advances in Steel Structures (ICASS’2018). — 2018. — P. K–05. DOI: 10.18057/ICASS2018.K.05.
Luo F.J., Ding C., Styles A., Bai Y, “End Plate-Stiffener Connection for SHS Column and RHS Beam in Steel-Framed Building Modules”, International Journal of Steel Structures. 2019. V. 19. Pp. 1353–1365. Doi.org/10.1007/s13296-019-00214- 6.
Chen Z., Khan K., Khan A., Javed K., Liu J, “Exploration of the multidirectional stability and response of prefabricated volumetric modular steel structures”, Journal of Constructional Steel Research. 2021.V.184.P.106826. Doi.org/10.1016/j.jcsr.2021.106826.
Lawson R.M., Richards J, “Modular design for high-rise buildings”, Proceedings of the Institution of Civil Engineers — Structures and Buildings. 2010. V. 163. Pp. 151–164. Doi.org/10.1680/stbu.2010.163.3.151.
Chen, Z., Wang, J., Liu, J., Khan, K, “Seismic behavior and moment transfer capacity of an innovative self-locking inter-module connection for modular steel building”, Engineering Structures. 2021. V. 245. P. 112978. Doi.org/10.1016/j.engstruct.2021.112978.
Rajanayagam H., Poologanathan K., Gatheeshgar P., Varelis G.E., Sherlock P., Nagaratnam B., Hackney P, “A-State-Of-The-Art review on modular building connections”, Structures. 2021. V. 34. P. 1903–1922. Doi.org/10.1016/j.istruc.2021.08.114.
Pang S.D., Liew J.Y.R., Dai Z., Wang Y. “Prefabricated prefinished volumetric construction joining techniques review”, Modular and Offsite Construction (MOC) Summit Edmonton, Alberta, Canada, September 29- October 01, 2016. Pp. 249–259. Doi.org/10.29173/mocs31.
Khan K., Yan J.-B, “Numerical studies on the seismic behavior of a prefabricated multi-storey modular steel building with new-type bolted joints”, Advanced Steel Construction. 2021. V. 17. Pp. 1–9. Doi:10.18057/IJASC.2021.17.1.1.
Ma R., Xia J., Chang H., Xu B., Zhang L, “Experimental and numerical investigation of mechanical properties on novel modular connections with superimposed beams”, Engineering Structures. — 2021. V. 232. P. 111858. Doi.org/10.1016/j.engstruct.2021.111858.
Zhao F., Yu Y., Lin S., Ding F, “Evaluation of the working mechanisms and simplified models of endplate-type inter-module connections”, Structures. 2021.V. 32. P. 562–577. Doi.org/10.1016/j.istruc.2021.03.034.
Farajian M., Sharafi P., Kildashti K, “The influence of inter-module connections on the effective length of columns in multi-story modular steel frames”, Journal of Constructional Steel Research. 2021. V. 177. P. 106450. Doi.org/10.1016/j.jcsr.2020.106450.
Annan C.D., Youssef M.A., El-Naggar M.H, “Seismic vulnerability assessment of modular steel buildings”, Journal of Earthquake Engineering. 2009. V. 13. Pp. 1065–1088. Doi: 10.1080/13632460902933881.
Teribele A., Turkienicz B, “Generative model and fixing guidelines for modular volumetric architecture”, Revista de la Construcción. 2018. V. 17, n. 3. Pp. 517–530. DOI: 10.7764/RDLC.17.3.517.
Hong. S.G, Lee E.J, “Response modification factor for lightweight steel panel-modular structures”, 15th World Conference on Earthquake Engineering Lisbon, Portugal, 2012. V. 5. P. 3733–3742
Ma R., Xia J., Chang H., Xu B., Zhang L, “Experimental and numerical investigation of mechanical properties on novel modular connections with superimposed beams”, Engineering Structures. 2021.V.232.P.111858. Doi.org/10.1016/j.engstruct.2021.111858.
Khan K., Yan J.-B, “Numerical studies on the seismic behavior of a prefabricated multi-storey modular steel building with new-type bolted joints”, Advanced Steel Construction. 2021. V. 17. Pp. 1–9. Doi:10.18057/IJASC.2021.17.1.1.
Cho B.-H., Lee J.-S., Kim H., Kim D.-J, “Structural performance of a new blind-bolted frame modular beam-column connection under lateral loading”, Applied Sciences. 2019. V. 9. P. 1929. Doi.org/10.3390/app9091929.
Nekilnojamojo turto agentūra - Ober-Haus Nekilnojamasis turtas Vilniuje, Kaune, Klaipėdoje, Palangoje,Šiauliuose,Panevėžyje, Druskininkuose. Turto vertinimas.
Inhabitat | Design For a Better World!
L.M. Lawson; R.G. Ogden, “Hybrid’ light steel panel and modular systems”, 2008. https://doi.org/10.1016/j.tws.2008.01.042
Technology for a Sustainable Future, OCT - DEC 2020, No. 153, Modular synthesis: all about prefab (OCT - DEC 2020), pp. 53-62; Alternative Technology Association.
Xhexhi, K, “Ecovillages and Ecocities. Bioclimatic Applications from Tirana, Albania” SpringerNature Switzerland AG, 2023. ISBN: 978-3-031-20961-1; DOI: 10.1007/978-3-031-20959-8
Braka, I., Bulku, A., Karriqi, A., Xhexhi, K., “Comparison of the Compression Test and the Rebound Test for Evaluating the Brand of Concrete in Precast Reinforced Concrete Elements”, Engineering and Technology Journal e-ISSN: 2456-3358. Volume 08 Issue 03 March-2023, Page No.-2021-2028. DOI https://doi.org/10.47191/etj/v8i3.03
Guri, M., Krosi, F., Xhexhi, K., “Study of Thermal performance of prefabricated large panel buildings”, Proceedings of the 2nd Croatian Conference on Earthquake Engineering - 2CroCEE Zagreb, Croatia - March 22 to 24, 2023 CroCEE. DOI: https://doi.org/10.5592/CO/2CroCEE.2023.63
https://businessmag.al/pirraci-u6-ndertesa-me-baze-konstruksione-metalike/
https://infoshendeti.com/2019/04/29/a-do-jete-2-euro-tarifa-e-kalimit-ne-autostraden-tirane-durres/